Installation and commissioning of the mixing tank equipment


1. Please inspect the equipment for any severe damage or deformation sustained during transportation, and check whether any fasteners are loose.
2. Users are requested to install this equipment horizontally on a solid foundation using pre-embedded anchor bolts.
3. Please ensure proper installation of the equipment, electrical control devices, and accessories under the guidance of qualified professionals. Verify that all piping is unobstructed, that installed instruments are correctly positioned, and that no damage is present. Before starting the equipment, inspect both the interior and exterior, as well as the surrounding area, for any persons or objects that could interfere with its normal operation, to prevent potential hazards.
4. After installation, please perform a test run for a few seconds first. Only proceed with a short trial rotation once you have confirmed there are no electrical shorts or unusual noises.
5. If the mixing tank is fitted with a mechanical seal, before starting the main unit an appropriate amount of No. 10 oil or sewing machine oil must be added to the seal’s lubrication groove, and cooling water must be supplied to the seal cooling chamber to ensure proper lubrication and cooling of the seal assembly. The mechanical seal is not pre-adjusted at the factory; after installation, adjust it to the correct position according to the installation and operating manual before normal operation (per user requirements).
6. After the equipment has been started under normal operating conditions, check the bearing temperature, operational smoothness, sealing integrity, and whether the instruments are functioning properly. Only proceed with feeding material once everything has been confirmed to be in good working order.